Two faster algorithms for coordination of production and batch delivery: a note
From MaRDI portal
Publication:2629739
DOI10.1016/j.ejor.2014.10.005zbMath1339.90042OpenAlexW2017443985MaRDI QIDQ2629739
Mohamed Ali Aloulou, Liang-Liang Fu, Alessandro Agnetis, Mikhail Y. Kovalyov
Publication date: 6 July 2016
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2014.10.005
Transportation, logistics and supply chain management (90B06) Production models (90B30) Dynamic programming (90C39)
Related Items (4)
Integrated production and delivery on parallel batching machines ⋮ Single machine scheduling with assignable due dates to minimize maximum and total late work ⋮ Complexity results for an integrated single machine scheduling and outbound delivery problem with fixed sequence ⋮ Just-in-time logistics for far-distant suppliers: scheduling truck departures from an intermediate cross-docking terminal
Cites Work
This page was built for publication: Two faster algorithms for coordination of production and batch delivery: a note