Coordination of production and interstage batch delivery with outsourced distribution
DOI10.1016/J.EJOR.2014.03.039zbMATH Open1338.90040OpenAlexW2125411986MaRDI QIDQ296709FDOQ296709
Alessandro Agnetis, Mohamed Ali Aloulou, Liang-Liang Fu
Publication date: 23 June 2016
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2014.03.039
dynamic programmingsupply chain schedulingbatching and deliveryoutsourced distributiontwo delivery modes
Deterministic scheduling theory in operations research (90B35) Dynamic programming (90C39) Transportation, logistics and supply chain management (90B06)
Cites Work
- Title not available (Why is that?)
- Sequencing the processing of incoming mail to match an outbound truck delivery schedule
- Integrated Production and Outbound Distribution Scheduling: Review and Extensions
- Machine scheduling with transportation considerations
- Integrated production and distribution scheduling with committed delivery dates
- Integrated Scheduling of Production and Distribution Operations
- Two-machine flowshop scheduling with intermediate transportation under job physical space consideration
- A bicriteria two-machine flow-shop serial-batching scheduling problem with bounded batch size
- Semi-online two-level supply chain scheduling problems
- Scheduling a production-distribution system to optimize the tradeoff between delivery tardiness and distribution cost
- Supply Chain Scheduling: Batching and Delivery
- Coordinated supply chain management
- Integrated production/distribution planning in supply chains: An invited review
- A class of joint production and transportation planning problems under different delivery policies
- Supply chain scheduling: sequence coordination
- The stock size problem
- Capacity Allocation and Scheduling in Supply Chains
- Supply Chain Scheduling: Conflict and Cooperation in Assembly Systems
- Coordination of Outsourced Operations at a Third-Party Facility Subject to Booking, Overtime, and Tardiness Costs
Cited In (16)
- Integrated production and transportation scheduling problem under nonlinear cost structures
- New exact and approximation algorithms for integrated production and transportation scheduling with committed delivery due dates and order acceptance
- An approximate dynamic programming approach for <scp>production‐delivery</scp> scheduling under non‐stationary demand
- Coordination of Outsourced Operations at a Third-Party Facility Subject to Booking, Overtime, and Tardiness Costs
- An upper bound for the inter-exit time of two jobs in an \(m\)-machine flow shop
- Single machine scheduling with assignable due dates to minimize maximum and total late work
- The coordination of scheduling and batch deliveries
- Integrated supply chain scheduling of procurement, production, and distribution under spillover effects
- On-line supply chain scheduling for single-machine and parallel-machine configurations with a single customer: minimizing the makespan and delivery cost
- Integrated production and delivery on parallel batching machines
- Supply chain scheduling in a collaborative manufacturing mode: model construction and algorithm design
- Two heuristic methods based on decomposition to the integrated multi-agent supply chain scheduling and distribution problem
- Complexity results for an integrated single machine scheduling and outbound delivery problem with fixed sequence
- Just-in-time logistics for far-distant suppliers: scheduling truck departures from an intermediate cross-docking terminal
- Coordinating Investment, Production, and Subcontracting
- Two faster algorithms for coordination of production and batch delivery: a note
This page was built for publication: Coordination of production and interstage batch delivery with outsourced distribution
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q296709)