An upper bound for the inter-exit time of two jobs in an m-machine flow shop
From MaRDI portal
Publication:6588488
Recommendations
- Batching and scheduling in a multi-machine flow shop
- Upper and lower bounds for the permutation flowshop scheduling problem with minimal time lags
- Permutation vs. non-permutation flow shop schedules
- Permutation schedules for a two-machine flow shop with storage
- On Minimizing the Expected Makespan and Flow Time in Stochastic Flow Shops with Blocking
Cites work
- A combinatorial analysis of the permutation and non-permutation flow shop scheduling problems
- Coordination of production and interstage batch delivery with outsourced distribution
- Development of M-Stage Decision Rule for Scheduling N Jobs Through M Machines
- Elimination methods in them ×n sequencing problem
- Flow Shop Lot Streaming
- Flowshop scheduling with dominant machines
- scientific article; zbMATH DE number 2146482 (Why is no real title available?)
- Integrated Production and Outbound Distribution Scheduling: Review and Extensions
- Minimizing maximum completion time in a proportionate flow shop with one machine of different speed
- New hard benchmark for flowshop scheduling problems minimising makespan
- No-wait flow shop scheduling with large lot sizes
- On-line integrated production and outbound distribution scheduling to minimize the maximum delivery completion time
- Optimal two- and three-stage production schedules with set-up time included
- Permutation vs. non-permutation flow shop schedules
- Robust scheduling in a two-machine re-entrant flow shop to minimise the value-at-risk of the makespan: branch-and-bound and heuristic algorithms based on Markovian activity networks and phase-type distributions
- Scheduling
- Scheduling and lot streaming in flowshops with no-wait in process
- Technical Note—Analysis of a Heuristic for One Machine Sequencing with Release Dates and Delivery Times
This page was built for publication: An upper bound for the inter-exit time of two jobs in an \(m\)-machine flow shop
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6588488)