On Minimizing the Expected Makespan and Flow Time in Stochastic Flow Shops with Blocking
From MaRDI portal
Publication:3745604
Recommendations
- Minimizing variation in stochastic flow shop
- Determining the optimal sequences and the distributional properties of their completion times in stochastic flow shops
- Stochastic flowshop no-wait scheduling
- A stochastic permutation-flowshop scheduling problem minimizing in distribution the schedule length
- Stochastically minimizing the makespan in two-machine flow shops without blocking
Cited in
(19)- Minimizing variation in stochastic flow shop
- Stochastically minimizing the makespan in two-machine flow shops without blocking
- Markovian analysis for performance evaluation and scheduling in m machine stochastic flow-shop with buffers of any capacity
- Three-stage ordered flow shops with either synchronous flow, blocking or no-idle machines
- A heuristic approach to minimize expected makespan in open shops subject to stochastic processing times and failures
- Determining the optimal sequences and the distributional properties of their completion times in stochastic flow shops
- Trading off between makespan and customer responsiveness in flow shop sequencing
- On heuristic solutions for the stochastic flowshop scheduling problem
- On Optimal Permutation Scheduling in Stochastic Proportionate Flowshops
- scientific article; zbMATH DE number 5525237 (Why is no real title available?)
- Stochastic flowshop no-wait scheduling
- On Pinedo's Conjecture for Scheduling in a Stochastic Flow Shop
- The stochastic flowshop makespan. Part II. Some general results for the unbuffered case
- Minimizing Cycle Time in a Blocking Flowshop
- Stochastic Minimization of the Makespan in Flow Shops with Identical Machines and Buffers of Arbitrary Size
- A new algorithm for minimizing makespan, Cmax, in blocking flow-shop problem through slowing down the operations
- An upper bound for the inter-exit time of two jobs in an \(m\)-machine flow shop
- A stochastic permutation-flowshop scheduling problem minimizing in distribution the schedule length
- Two-machine stochastic flow shops with blocking and the traveling salesman problem