A Multi-Stage Two-Machines Replacement Strategy Using Mixture Models, Bayesian Inference, and Stochastic Dynamic Programming
From MaRDI portal
Publication:3007820
DOI10.1080/03610920903453459zbMath1217.62156OpenAlexW2053255944MaRDI QIDQ3007820
Mohammad Saber Fallah Nezhad, Seyed Taghi Akhavan Niaki
Publication date: 17 June 2011
Published in: Communications in Statistics - Theory and Methods (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/03610920903453459
Lua error in Module:PublicationMSCList at line 37: attempt to index local 'msc_result' (a nil value).
Related Items (2)
A Finite Horizon Dynamic Programming Model for Production and Repair Decisions ⋮ An integrated model for economic design of chi-square control chart and maintenance planning
Cites Work
- Unnamed Item
- Optimal adaptive control policy for joint machine maintenance and product quality control
- Control limits for two-state partially observable Markov decision processes
- Bayesian semiparametric analysis for a single item maintenance optimization
- On the application of mathematical models in maintenance
- An efficient heuristic for a partially observable Markov decision process of machine replacement
- A survey of maintenance policies of deteriorating systems
- A condition based maintenance model for a two-unit series system
- Optimal preventive maintenance of a production system with an intermediate buffer
- Optimal equipment replacement without paradoxes: A continuous analysis
- Stability of real-time lot-scheduling and machine replacement policies with quality levels
- A state-age dependent policy for a shock process
- Optimum Preventive Maintenance Policies
- A Bayesian Inference and Stochastic Dynamic Programming Approach to Determine the Best Binomial Distribution
- Semi-Markov shock models with additive damage
- Optimal maintenance policy for stochastically failing equipment: A diffusion approximation
- Optimal replacement in a shock model: discrete time
- Generalized Mathematical Programming for Optimal Replacement in a Semi-Markov Shock Model
- Ordered Solutions for Dynamic Programs
- Structural Results for Partially Observable Markov Decision Processes
- A note on the optimal replacement time of damaged devices
- Optimal Replacement for Shock Models with General Failure Rate
- State of the Art—A Survey of Partially Observable Markov Decision Processes: Theory, Models, and Algorithms
- Replacement models under additive damage
- Optimal control-limit strategies for a partially observed replacement problem†
- Bayesian maintenance policies during a warranty period
- On parallel machine replacement problems with general replacement cost functions and stochastic deterioration
This page was built for publication: A Multi-Stage Two-Machines Replacement Strategy Using Mixture Models, Bayesian Inference, and Stochastic Dynamic Programming