A multicriteria approach to timeout collaboration protocol
From MaRDI portal
Publication:3055260
DOI10.1080/00207540802172045zbMath1198.90349OpenAlexW1995780404MaRDI QIDQ3055260
Publication date: 7 November 2010
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540802172045
Programming involving graphs or networks (90C35) Applications of statistics to actuarial sciences and financial mathematics (62P05) Multi-objective and goal programming (90C29) Management decision making, including multiple objectives (90B50)
Cites Work
- Unnamed Item
- Decision making in stock trading: an application of PROMETHEE
- How to select and how to rank projects: The PROMETHEE method
- A multiobjective optimization approach to thermal generating units maintenance scheduling
- Multiple and bicriteria scheduling: A literature survey
- PROMETHEE and AHP: the design of operational synergies in multicriteria analysis. Strengthening PROMETHEE with ideas of AHP.
- Proper efficiency and the theory of vector maximization
- Note—A Preference Ranking Organisation Method
- The Vector Maximization Problem: Proper Efficiency and Stability
- Client-server model of integrated production facilities
- Reducing total tardiness cost in manufacturing cell scheduling by a multi-factor priority rule
This page was built for publication: A multicriteria approach to timeout collaboration protocol