Single-machine scheduling with flexible and periodic maintenance

From MaRDI portal
Revision as of 18:28, 4 February 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:3418856

DOI10.1057/palgrave.jors.2602043zbMath1121.90052OpenAlexW2015910829MaRDI QIDQ3418856

No author found.

Publication date: 26 January 2007

Published in: Journal of the Operational Research Society (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1057/palgrave.jors.2602043




Related Items (15)

Simultaneous production and maintenance planning for a single capacitated resource facing both a dynamic demand and intensive wear and tearMinimising total flow-time on two parallel machines with planned downtimes and resumable jobsMathematical programming models for competitive two-agent single-machine scheduling with flexible periodic maintenance activitiesIntegrated production scheduling and maintenance policy for robustness in a single machineMinimizing the makespan on a single machine with flexible maintenances and jobs' release datesScheduling two parallel machines with machine-dependent availabilitiesMinimizing total completion time on a single machine with a flexible maintenance activityA two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machinesMinimizing the sum of completion times on a single machine with health index and flexible maintenance operationsExact solution of the single-machine scheduling problem with periodic maintenances and sequence-dependent setup timesMinimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenanceMinimizing the makespan in a single machine scheduling problems with flexible and periodic maintenanceA single-machine scheduling problem with maintenance activities to minimize makespanTwo-machine flow shop and open shop scheduling problems with a single maintenance windowMakespan minimization for two parallel machines scheduling with a periodic availability constraint: mathematical programming model, average-case analysis, and anomalies




This page was built for publication: Single-machine scheduling with flexible and periodic maintenance