A single-machine scheduling problem with maintenance activities to minimize makespan
DOI10.1016/J.AMC.2009.11.040zbMATH Open1181.90117OpenAlexW2078384930MaRDI QIDQ2266971FDOQ2266971
Authors: Chou-Jung Hsu, Chinyao Low, Chwen-Tzeng Su
Publication date: 26 February 2010
Published in: Applied Mathematics and Computation (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.amc.2009.11.040
Recommendations
- Scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan
- Minimizing the makespan in a single machine scheduling problems with flexible and periodic maintenance
- Single-machine scheduling with flexible and periodic maintenance
- Single-machine scheduling with periodic maintenance to minimize makespan
- Single-machine scheduling with periodic maintenance and nonresumable jobs.
Reliability, availability, maintenance, inspection in operations research (90B25) Deterministic scheduling theory in operations research (90B35) Boolean programming (90C09)
Cites Work
- Title not available (Why is that?)
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Title not available (Why is that?)
- Minimizing total flow time in the single-machine scheduling problem with periodic maintenance
- Single-machine scheduling with periodic maintenance to minimize makespan
- Parallel machine scheduling with almost periodic maintenance and non-preemptive jobs to minimize makespan
- Scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan
- Single-machine scheduling with flexible and periodic maintenance
- Makespan minimization for two parallel machines scheduling with a periodic availability constraint
- A note on ``scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan
Cited In (13)
- Equivalence of some different maintenance activities in single-machine scheduling
- Minimizing the total completion time on a single machine with the learning effect and multiple availability constraints
- Single-machine scheduling with periodic maintenance to minimize makespan
- Exact solution of the single-machine scheduling problem with periodic maintenances and sequence-dependent setup times
- Minimizing the weighted sum of maximum earliness and maximum tardiness costs on a single machine with periodic preventive maintenance
- Minimizing total completion time on a single machine with a flexible maintenance activity
- Minimizing the makespan in a single machine scheduling problems with flexible and periodic maintenance
- Scheduling a maintenance activity and due-window assignment on a single machine
- Robust single machine scheduling with a flexible maintenance activity
- Single machine batch scheduling to minimize the sum of total flow time and batch delivery cost with an unavailability interval
- Scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan
- Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance
- Heuristic methods for the single-machine scheduling problem with periodical resource constraints
This page was built for publication: A single-machine scheduling problem with maintenance activities to minimize makespan
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2266971)