A Priori and A Posteriori Aggregation Procedures to Reduce Model Size in MIP Mine Planning Models
From MaRDI portal
Publication:3503570
DOI10.1016/j.endm.2008.01.051zbMath1341.90075OpenAlexW2027915968MaRDI QIDQ3503570
Ximena Schultz, Marianela Pereira, Andrés P. Weintraub
Publication date: 5 June 2008
Published in: Electronic Notes in Discrete Mathematics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.endm.2008.01.051
Related Items (5)
Medium range optimization of copper extraction planning under uncertainty in future copper prices ⋮ Optimization-based heuristics for underground mine scheduling ⋮ A matheuristic for tactical locomotive and driver scheduling for the swiss national railway company SBB Cargo AG ⋮ Optimizing a mineral value chain with market uncertainty using Benders decomposition ⋮ Short-term planning optimization model for underground mines
Cites Work
This page was built for publication: A Priori and A Posteriori Aggregation Procedures to Reduce Model Size in MIP Mine Planning Models