Two heuristics for the economic lot scheduling problem: An experimental study
From MaRDI portal
Publication:3783807
DOI<605::AID-NAV3220350412>3.0.CO;2-V 10.1002/1520-6750(198808)35:4<605::AID-NAV3220350412>3.0.CO;2-VzbMath0642.90032MaRDI QIDQ3783807
P. C. Geng, Raymond G. Vickson
Publication date: 1988
Full work available at URL: https://doi.org/10.1002/1520-6750(198808)35:4<605::aid-nav3220350412>3.0.co;2-v
Related Items
The economic lot scheduling problem under power-of-two policy, The peak load minimization problem in cyclic production, The economic lot scheduling problem under extended basic period and power-of-two policy, A job-splitting heuristic for lot-size scheduling in multi-stage, multi- product production processes, The economic lot scheduling problem without capacity constraints, Solving the economic lot scheduling problem with multiple facilities in parallel using the time-varying lot sizes approach