scientific article

From MaRDI portal
Revision as of 13:09, 5 February 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:3783827

zbMath0642.90055MaRDI QIDQ3783827

François Soumis, Savelsbergh, Martin W. P., Jan Karel Lenstra, Martin Desrochers

Publication date: 1988


Title: zbMATH Open Web Interface contents unavailable due to conflicting licenses.





Related Items (33)

The discrete lot-sizing and scheduling problem with sequence-dependent setup costsA parallel route building algorithm for the vehicle routing and scheduling problem with time windowsA robust strategy approach to a strategic mobility problemA parallel implementation of the tabu search heuristic for vehicle routing problems with time window constraintsThe split delivery vehicle scheduling problem with time windows and grid network distancesLength-constrained cycle partition with an application to UAV routing*The dynamic vehicle rescheduling problemPricing routines for vehicle routing with time windows on road networksMIP neighborhood synthesis through semantic feature extraction and automatic algorithm configurationThe vehicle routing problem with flexible time windows and traveling timesRouting problems: A bibliographyA dynamic logistics coordination model for evacuation and support in disaster response activitiesA learn‐and‐construct framework for general mixed‐integer programming problemsEjection chain moves for automatic neighborhood synthesis in constrained cardinality‐minimization problemsLocal search with annealing-like restarts to solve the VRPTWAnt colony system for a VRP with multiple time windows and multiple visitsA biobjective decision model to increase security and reduce travel costs in the cash-in-transit sectorTowards a decision support system for the ready concrete distribution system: a case of a Greek company.Dynamic Traveling Repair Problem with an Arbitrary Time WindowOn the computational complexity of the probabilistic traveling salesman problem with deadlinesThe pickup and delivery problem with time windowsAn iterated local search algorithm for the time-dependent vehicle routing problem with time windowsRecent progress of local search in handling the time window constraints of the vehicle routing problemMulti-trip time-dependent vehicle routing problem with soft time windows and overtime constraintsImprovements and extensions to Miller-Tucker-Zemlin subtour elimination constraintsModeling and solving the fuel distribution problem with unloading precedence and loading sequence considerationsA route-neighborhood-based metaheuristic for vehicle routing problem with time windowsPractical aspects of route planning for magazine and newspaper wholesalersThe pickup and delivery problem with transfers: formulation and a branch-and-cut solution methodArc routing in a node routing environmentSurvey of research in the design and control of automated guided vehicle systemsOn compact formulations for integer programs solved by column generationTabu search heuristics for the vehicle routing problem with time windows.







This page was built for publication: