Time-Optimal Control of Resource Allocation in a Complex of Operations Framework
From MaRDI portal
Publication:4104473
DOI10.1109/TSMC.1976.4309456zbMath0336.49022OpenAlexW4251622085MaRDI QIDQ4104473
Publication date: 1976
Published in: IEEE Transactions on Systems, Man, and Cybernetics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1109/tsmc.1976.4309456
Related Items (13)
A revised critical path method for networks including both overlap relationships and variable-duration activities ⋮ Scheduling preemptable jobs on identical processors under varying availability of an additional continuous resource ⋮ Total completion time minimization for machine scheduling problem under time windows constraints with jobs' linear processing rate function ⋮ Project scheduling with finite or infinite number of activity processing modes -- a survey ⋮ On a certain class of power- and energy-related scheduling problems ⋮ Solving a power-aware scheduling problem by grouping jobs with the same processing characteristic ⋮ Heuristic approaches to discrete-continuous project scheduling problems to minimize the makespan ⋮ Revenue sharing for resource transfer among projects ⋮ Some efficient multi-heuristic procedures for resource-constrained project scheduling ⋮ Discrete-continuous project scheduling with discounted cash inflows and various payment models -- a review of recent results ⋮ Optimal resource profiles for program scheduling ⋮ Optimal control policies for resource allocation in an activity network ⋮ Mathematical programming formulations for machine scheduling: A survey
This page was built for publication: Time-Optimal Control of Resource Allocation in a Complex of Operations Framework