Determining a threshold control policy for an imperfect production system with rework jobs
From MaRDI portal
Publication:4243198
DOI<273::AID-NAV3>3.0.CO;2-3 10.1002/(SICI)1520-6750(199904)46:3<273::AID-NAV3>3.0.CO;2-3zbMath0922.90078OpenAlexW2020256569MaRDI QIDQ4243198
Publication date: 4 October 1999
Full work available at URL: https://doi.org/10.1002/(sici)1520-6750(199904)46:3<273::aid-nav3>3.0.co;2-3
thresholdlot sizecycle timeimperfect production systemthreshold control policybatch control policydefect jobsrework jobs
Related Items (2)
Optimizing a production system with rework and equal sized batch shipments ⋮ Lot sizing in a production system with rework and product deterioration
Cites Work
- Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs
- Optimal control of production rate in a failure prone manufacturing system
- Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction
- Production Control in Multistage Systems with Variable Yield Losses
- Optimality of Zero-Inventory Policies for Unreliable Manufacturing Systems
- Bayes Markovian Decision Models for a Multiperiod Reject Allowance Problem
This page was built for publication: Determining a threshold control policy for an imperfect production system with rework jobs