Economic lot scheduling problem with imperfect production processes and setup times
From MaRDI portal
Publication:4656665
DOI10.1057/palgrave.jors.2601350zbMath1059.90071MaRDI QIDQ4656665
No author found.
Publication date: 14 March 2005
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/palgrave.jors.2601350
capacity constraint; imperfect production processes; economic lot scheduling problem; common cycle approach; time-varying lot sizes approach
Related Items
Agile factorial production for a single manufacturing line with multiple products, An optimal common production cycle time for imperfect production processes with scrap, An optimal setup cost reduction and lot size for economic production quantity model with imperfect quality and quantity discounts, Learning curves for imperfect production processes with reworks and process restoration interruptions, A genetic algorithm for solving the economic lot scheduling problem in flow shops, Design of effective inspection schema for imperfect production systems