Planning lot sizes and capacity requirements in a single stage production system (Q1821021)

From MaRDI portal
Revision as of 04:48, 5 March 2024 by Import240304020342 (talk | contribs) (Set profile property.)
scientific article
Language Label Description Also known as
English
Planning lot sizes and capacity requirements in a single stage production system
scientific article

    Statements

    Planning lot sizes and capacity requirements in a single stage production system (English)
    0 references
    1987
    0 references
    The problem addressed in this paper is the determination of lot sizes for multiple products to be produced on a single production facility with limited capacity. Demand is assumed to be deterministic and time-varying and must be met without backordering. The objective is to minimize the sum of setup and inventory holding costs. A heuristic solution procedure of the period-by-period type is presented. Moreover, the interaction between lot sizing and smoothing of capacity requirements is investigated in a case study.
    0 references
    planning
    0 references
    scheduling
    0 references
    lot sizes
    0 references
    multiple products
    0 references
    single production facility
    0 references
    limited capacity
    0 references
    0 references

    Identifiers