Parallel-machine scheduling problems with past-sequence-dependent delivery times and aging maintenance

From MaRDI portal
Revision as of 07:33, 6 March 2024 by Import240305080351 (talk | contribs) (Created automatically from import240305080351)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:1666798


DOI10.1155/2015/865978zbMath1394.90292WikidataQ59119716 ScholiaQ59119716MaRDI QIDQ1666798

Lei Ning, Xue-qin Zeng, Li Sun, Wei-Min Ma

Publication date: 27 August 2018

Published in: Mathematical Problems in Engineering (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1155/2015/865978


90B35: Deterministic scheduling theory in operations research

90B25: Reliability, availability, maintenance, inspection in operations research


Related Items



Cites Work