Scheduling Deteriorating Jobs on a Single Processor

From MaRDI portal
Publication:3483073

DOI10.1287/opre.38.3.495zbMath0703.90051OpenAlexW2137958320MaRDI QIDQ3483073

Sid Browne, Uri Yechiali

Publication date: 1990

Published in: Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1287/opre.38.3.495




Related Items (only showing first 100 items - show all)

Scheduling jobs under simple linear deteriorationParallel-machine serial-batching scheduling with release times under the effects of position-dependent learning and time-dependent deteriorationThe complexity of scheduling starting time dependent tasks with release timesSingle machine scheduling models with deterioration and learning: Handling precedence constraints via priority generationParallel-machine scheduling of simple linear deteriorating jobsDue date assignment and single machine scheduling with deteriorating jobs to minimize the weighted number of tardy jobsParallel machine scheduling with completion-time-based criteria and sequence-dependent deteriorationComplexity analysis of job-shop scheduling with deteriorating jobsAn FPTAS for scheduling jobs with piecewise linear decreasing processing times to minimize makespanA note on scheduling on a single processor with speed dependent on a number of executed jobsMinimizing total completion time in a two-machine flow shop with deteriorating jobsParallel machine scheduling to minimize the makespan with sequence dependent deteriorating effectsA tabu method for a two-agent single-machine scheduling with deterioration jobsSingle-machine scheduling with deteriorating jobs and learning effects to minimize the makespanMatheuristic approaches for parallel machine scheduling problem with time-dependent deterioration and multiple rate-modifying activitiesA branch-and-price algorithm for scheduling of deteriorating jobs and flexible periodic maintenance on a single machineHow to collect balls moving in the Euclidean planeFlow shop scheduling problems with decreasing linear deterioration under dominant machinesA decomposition-based two-stage optimization algorithm for single machine scheduling problems with deteriorating jobsSum-of-processing-times-based two-agent single-machine scheduling with aging effects and tardinessSingle machine problem with multi-rate-modifying activities under a time-dependent deteriorationParallel-machine scheduling problems with past-sequence-dependent delivery times and aging maintenanceParallel-machine scheduling with time-dependent and machine availability constraintsA time-dependent scheduling problem to minimize the sum of the total weighted tardiness among two agentsSingle-machine scheduling with deteriorating jobs and aging effects under an optional maintenance activity considerationOnline scheduling of simple linear deteriorating jobs to minimize the total general completion timeA single-machine scheduling problem with two-agent and deteriorating jobsSingle machine quadratic penalty function scheduling with deteriorating jobs and group technologySingle-machine scheduling with deteriorating functions for job processing timesA branch and bound algorithm for single machine scheduling with deteriorating values of jobsApproximation algorithms for parallel machine scheduling with linear deteriorationImpact of job-sequence on the down-time of a deteriorating flexible machinePatients scheduling problems with deferred deteriorated functionsMinimizing total weighted completion time in a two-machine flow shop scheduling under simple linear deteriorationA note on two-machine no-wait flow shop scheduling with deteriorating jobs and machine availability constraintsSome single-machine scheduling problems with general effects of learning and deteriorationScheduling problems with general effects of deterioration and learningA concise survey of scheduling with time-dependent processing timesScheduling with time-dependent discrepancy timesAn FPTAS for uniform machine scheduling to minimize makespan with linear deteriorationMinimizing total load on a proportionate flowshop with position-dependent processing times and job-rejectionSingle-machine group scheduling with general deterioration and learning effectsGroup scheduling problems with simultaneous considerations of learning and deterioration effects on a single-machineSingle-machine due-window assignment problem with learning effect and deteriorating jobsGroup scheduling with deteriorating jobs to minimize the total weighted number of late jobsNew results on single-machine scheduling with past-sequence-dependent delivery timesSingle-machine scheduling problems with time and position dependent processing timesScheduling on parallel identical machines with job-rejection and position-dependent processing timesSingle-machine scheduling with past-sequence-dependent delivery times and release timesUniform parallel-machine scheduling with time dependent processing timesMulti-machine scheduling with interval constrained position-dependent processing timesScheduling a variable maintenance and linear deteriorating jobs on a single machineScheduling simple linear deteriorating jobs with rejectionRescheduling problems with agreeable job parameters to minimize the tardiness costs under deterioration and disruptionMinimizing the makespan for scheduling problems with general deterioration effectsConsiderations of single-machine scheduling with deteriorating jobsScheduling with deteriorating jobs and learning effectsSingle-machine scheduling with a nonlinear deterioration functionTwo-agent single-machine scheduling of jobs with time-dependent processing times and ready timesScheduling with learning effects and/or time-dependent processing times to minimize the weighted number of tardy jobs on a single machineSome single-machine and flowshop scheduling problems with a non-linear deterioration functionOnline scheduling with linear deteriorating jobs to minimize the total weighted completion timeUnrelated parallel-machine scheduling problems with aging effects and deteriorating maintenance activitiesA single-machine scheduling with a truncated linear deterioration and ready timesScheduling on a single processor with variable speedSerial-batching scheduling with time-dependent setup time and effects of deterioration and learning on a single-machineFlow shop scheduling with effects of learning and deteriorationMinimizing the makespan with an availability constraint on a single machine under simple linear deteriorationScheduling deteriorating jobs on a single serial-batching machine with multiple job types and sequence-dependent setup timesScheduling linear deteriorating jobs with rejection on a single machineDynamic priority rules when polling with multiple parallel serversScheduling linear deteriorating jobs to minimize the number of tardy jobsLearning effect and deteriorating jobs in the single machine scheduling problemsScheduling deteriorating jobs on a single machine subject to breakdownsRescheduling problems with deteriorating jobs under disruptionsA due-date assignment problem with learning effect and deteriorating jobsDue-window assignment and scheduling with multiple rate-modifying activities under the effects of deterioration and learningSingle machine scheduling problems under the effects of nonlinear deterioration and time-dependent learningTwo-agent scheduling with position-based deteriorating jobs and learning effectsSingle-machine scheduling with deteriorating jobs and setup times to minimize the maximum tardinessSingle-machine group scheduling problems with deteriorated and learning effectSingle-machine scheduling with deteriorating jobs and past-sequence-dependent setup timesTwo-agent single-machine scheduling problems under increasing linear deteriorationThe Browne-Yechiali single-machine sequence is optimal for flow-shopsA unified analysis for the single-machine scheduling problem with controllable and non-controllable variable job processing timesPreemptive scheduling with simple linear deterioration on a single machineParallel-machine scheduling with deteriorating jobs and rejectionSingle machine scheduling with decreasing linear deterioration under precedence constraintsParallel machines scheduling to minimize job tardiness and machine deteriorating cost with deteriorating jobsMinimizing the total completion time in permutation flow shop with machine-dependent job deterioration ratesSingle machine parallel-batch scheduling with deteriorating jobsParallel machine earliness/tardiness scheduling problem under the effects of position based learning and linear/nonlinear deteriorationA dynamic programming algorithm for the single-machine scheduling problem with release dates and deteriorating processing timesScheduling linear deteriorating jobs to minimize makespan with an availability constraint on a single machineOn a scheduling problem of time deteriorating jobsPreemptive repayment policy for multiple loansJob sequencing rules for minimizing the expected makespan in flexible machinesScheduling jobs under decreasing linear deteriorationA FPTAS for minimizing total completion time in a single machine time-dependent scheduling problemMinimizing the total weighted completion time of deteriorating jobs




This page was built for publication: Scheduling Deteriorating Jobs on a Single Processor