Parallel-batch scheduling with two models of deterioration to minimize the makespan

From MaRDI portal





Summary: We consider the bounded parallel-batch scheduling with two models of deterioration, in which the processing time of the first model is \(p_j = a_j + \alpha t\) and of the second model is \(p_j = a + \alpha_j t\). The objective is to minimize the makespan. We present \(O(n \text{log} n)\) time algorithms for the single-machine problems, respectively. And we propose fully polynomial time approximation schemes to solve the identical-parallel-machine problem and uniform-parallel-machine problem, respectively.











This page was built for publication: Parallel-batch scheduling with two models of deterioration to minimize the makespan

Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1724245)