Case study on statistically estimating minimum makespan for flow line scheduling problems. (Q1427564)

From MaRDI portal
Revision as of 15:29, 6 June 2024 by ReferenceBot (talk | contribs) (‎Changed an Item)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
scientific article
Language Label Description Also known as
English
Case study on statistically estimating minimum makespan for flow line scheduling problems.
scientific article

    Statements

    Case study on statistically estimating minimum makespan for flow line scheduling problems. (English)
    0 references
    0 references
    0 references
    0 references
    14 March 2004
    0 references
    0 references
    0 references
    0 references
    0 references
    Heuristics
    0 references
    Scheduling
    0 references
    Confidence-interval estimation
    0 references
    Flexible flow line
    0 references
    0 references