The poset scheduling problem (Q1062616)

From MaRDI portal
Revision as of 17:40, 14 June 2024 by ReferenceBot (talk | contribs) (‎Changed an Item)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
scientific article
Language Label Description Also known as
English
The poset scheduling problem
scientific article

    Statements

    The poset scheduling problem (English)
    0 references
    0 references
    0 references
    0 references
    1985
    0 references
    Let P and Q be two finite posets and for each \(p\in P\) and \(q\in Q\) let c(p,q) be a specified (real-valued) cost. The poset scheduling problem is to find a function s:P\(\to Q\) such that \(\sum_{p\in P}c(p,s(p))\) is minimized, subject to the constraints that \(p<p'\) in P implies \(s(p)<s(p')\) in Q. We prove that the poset scheduling problem is NP-hard. This problem with a totally ordered poset Q is proved to be transformable to the closed set problem or the minimum cut problem in a network.
    0 references
    NP-complete
    0 references
    poset scheduling
    0 references
    NP-hard
    0 references
    closed set problem
    0 references
    minimum cut problem
    0 references