Minimizing the number of tardy jobs in a permutation flowshop scheduling problem with setup times and time lags constraints (Q367232)

From MaRDI portal
Revision as of 22:48, 6 July 2024 by ReferenceBot (talk | contribs) (‎Changed an Item)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
scientific article
Language Label Description Also known as
English
Minimizing the number of tardy jobs in a permutation flowshop scheduling problem with setup times and time lags constraints
scientific article

    Statements

    Minimizing the number of tardy jobs in a permutation flowshop scheduling problem with setup times and time lags constraints (English)
    0 references
    0 references
    0 references
    0 references
    26 September 2013
    0 references
    permutation flowshop
    0 references
    setup times
    0 references
    time lags
    0 references
    mathematical programming
    0 references
    simulated annealing
    0 references

    Identifiers