Variable neighborhood search for the single machine scheduling problem to minimize the total early work
From MaRDI portal
Publication:6063510
DOI10.1007/s11590-022-01913-6MaRDI QIDQ6063510
Saïd Hanafi, Rachid Benmansour, Raca Todosijević
Publication date: 7 November 2023
Published in: Optimization Letters (Search for Journal in Brave)
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Combinatorial optimization (90C27) Dynamic programming (90C39)
Cites Work
- Unnamed Item
- Unnamed Item
- Ant colony systems for the single-machine total weighted earliness tardiness scheduling problem
- Nested general variable neighborhood search for the periodic maintenance problem
- Minimizing the weighted sum of maximum earliness and maximum tardiness costs on a single machine with periodic preventive maintenance
- A single machine scheduling problem to minimize total early work
- Minimizing the number of tardy job units under release time constraints
- Variable neighborhood search
- General variable neighborhood search for computing graph separators
- General variable neighborhood search for the order batching and sequencing problem
- Variable neighborhood search: basics and variants
- Less is more: general variable neighborhood search for the capacitated modular hub location problem
- Mirror scheduling problems with early work and late work criteria
- Approximation algorithms for minimizing the maximum lateness and makespan on parallel machines
- THE NP-HARDNESS OF MINIMIZING THE TOTAL LATE WORK ON AN UNBOUNDED BATCH MACHINE
- Single Machine Scheduling to Minimize Total Late Work
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Sequential variable neighborhood descent variants: an empirical study on the traveling salesman problem
- Handbook on Scheduling
- Variable neighborhood search: Principles and applications
This page was built for publication: Variable neighborhood search for the single machine scheduling problem to minimize the total early work