Algorithms for two-agent unbounded serial-batch scheduling with makespan and maximum lateness objectives

From MaRDI portal
Revision as of 08:05, 10 July 2024 by Import240710060729 (talk | contribs) (Created automatically from import240710060729)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:6186161

DOI10.3934/nhm.2023073OpenAlexW4387109930MaRDI QIDQ6186161

Shuguang Li, Mingsong Li, Muhammad Ijaz Khan

Publication date: 2 February 2024

Published in: Networks and Heterogeneous Media (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.3934/nhm.2023073





Cites Work