Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case (Q864823)

From MaRDI portal
Revision as of 06:01, 10 December 2024 by Import241208061232 (talk | contribs) (Normalize DOI.)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
scientific article
Language Label Description Also known as
English
Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case
scientific article

    Statements

    Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case (English)
    0 references
    0 references
    13 February 2007
    0 references
    flexible flow line
    0 references
    lot scheduling
    0 references
    metaheuristics
    0 references
    finite horizon
    0 references
    limited intermediate buffers
    0 references

    Identifiers