Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns (Q869601)

From MaRDI portal
Revision as of 06:15, 10 December 2024 by Import241208061232 (talk | contribs) (Normalize DOI.)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
scientific article
Language Label Description Also known as
English
Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
scientific article

    Statements

    Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns (English)
    0 references
    0 references
    0 references
    0 references
    8 March 2007
    0 references
    inventory
    0 references
    machine breakdown
    0 references
    production run time
    0 references
    defective rate
    0 references
    rework
    0 references

    Identifiers