Lot Sizing to Reduce Capacity Utilization in a Production Process with Defective Items, Process Corrections, and Rework (Q4015265)

From MaRDI portal
Revision as of 22:35, 28 December 2024 by Import241228121245 (talk | contribs) (Normalize DOI.)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
scientific article
Language Label Description Also known as
English
Lot Sizing to Reduce Capacity Utilization in a Production Process with Defective Items, Process Corrections, and Rework
scientific article

    Statements

    Lot Sizing to Reduce Capacity Utilization in a Production Process with Defective Items, Process Corrections, and Rework (English)
    0 references
    0 references
    12 January 1993
    0 references
    lot sizing
    0 references
    semiconductor manufacturing
    0 references

    Identifiers