Scheduling with tool changes to minimize total completion time: A study of heuristics and their performance (Q4456055)

From MaRDI portal
Revision as of 02:44, 30 December 2024 by Import241228121245 (talk | contribs) (Normalize DOI.)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
scientific article; zbMATH DE number 2057722
Language Label Description Also known as
English
Scheduling with tool changes to minimize total completion time: A study of heuristics and their performance
scientific article; zbMATH DE number 2057722

    Statements

    Scheduling with tool changes to minimize total completion time: A study of heuristics and their performance (English)
    0 references
    0 references
    0 references
    0 references
    15 March 2004
    0 references
    scheduling
    0 references
    heuristics
    0 references

    Identifiers