Pages that link to "Item:Q4456055"
From MaRDI portal
The following pages link to Scheduling with tool changes to minimize total completion time: A study of heuristics and their performance (Q4456055):
Displayed 12 items.
- Minimizing total completion time on a single machine with a flexible maintenance activity (Q613512) (← links)
- Scheduling with tool changes to minimize total completion time: Basic results and SPT performance (Q703937) (← links)
- Scheduling with tool changes to minimize total completion time under controllable machining conditions (Q868153) (← links)
- A note on worst-case performance of heuristics for maintenance scheduling problems (Q868400) (← links)
- Job scheduling and management of wearing tools with stochastic tool lifetimes (Q955695) (← links)
- Minimizing total flow time on a single flexible machine (Q988776) (← links)
- Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance (Q1761146) (← links)
- The general two-level storage management problem: a reconsideration of the KTNS-rule (Q2576258) (← links)
- The tool transporter movements problem in flexible manufacturing systems (Q3498887) (← links)
- SINGLE MACHINE SCHEDULING WITH FORBIDDEN INTERVALS AND JOB DELIVERY TIMES (Q3526523) (← links)
- Minimizing maximum tardiness in single FMS machine scheduling with tool changes (Q5188152) (← links)
- Operational methods for minimization of energy consumption of manufacturing equipment (Q5444532) (← links)