Publication | Date of Publication | Type |
---|
Order acceptance with weighted tardiness | 2007-04-26 | Paper |
Aversion scheduling in the presence of risky jobs | 2006-10-25 | Paper |
A Simple Heuristic for Computing Nonstationary (s, S) Policies | 2003-07-17 | Paper |
Inventory control under speculation: Myopic heuristics and exact procedures | 2002-11-17 | Paper |
Capacity Expansion and Replacement in Growing Markets with Uncertain Technological Breakthroughs | 2002-04-17 | Paper |
Myopic Heuristics for the Random Yield Problem | 2002-01-13 | Paper |
Periodic review stochastic inventory problem with forecast updates: Worst-case bounds for the myopic solution | 2000-06-14 | Paper |
`Aversion dynamics' scheduling when the system changes | 2000-06-05 | Paper |
Selecting jobs for heavily loaded shop with lateness penalties | 1997-01-06 | Paper |
The Nonstationary Stochastic Lead-Time Inventory Problem: Near-Myopic Bounds, Heuristics, and Testing | 1996-08-05 | Paper |
The Finite Horizon Nonstationary Stochastic Inventory Problem: Near-Myopic Bounds, Heuristics, Testing | 1995-11-09 | Paper |
A Periodic Review, Production Planning Model with Uncertain Capacity and Uncertain Demand—Optimality of Extended Myopic Policies | 1994-10-04 | Paper |
Near Myopic Heuristics for the Fixed-Life Perishability Problem | 1994-03-24 | Paper |
Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics | 1993-06-29 | Paper |
A hybrid heuristic for the facilities layout problem | 1991-01-01 | Paper |
The Single Machine Early/Tardy Problem | 1989-01-01 | Paper |
Planning horizons for capacity expansion | 1988-01-01 | Paper |
Minimal forecast horizon procedures for dynamic lot size models | 1986-01-01 | Paper |
A Forward Simplex Method for Staircase Linear Programs | 1985-01-01 | Paper |
A forward algorithm and planning horizon procedure for the production smoothing problem without inventory | 1984-01-01 | Paper |
A Perfect Planning Horizon Procedure for a Deterministic Cash Balance Problem | 1982-01-01 | Paper |
Infinite-Horizon Dynamic Programming Models—A Planning-Horizon Formulation | 1979-01-01 | Paper |
Universal Planning Horizons for Generalized Convex Production Scheduling | 1978-01-01 | Paper |
The Nonstationary Infinite Horizon Inventory Problem | 1978-01-01 | Paper |
Note—An Improved Algorithm for the Stationary Cost Dynamic Lot Size Model with Backlogging | 1978-01-01 | Paper |
Protective Planning-Horizon Procedures for a Deterministic Cash Balance Problem | 1978-01-01 | Paper |
Algoristics for Single-Machine Sequencing with Precedence Constraints | 1978-01-01 | Paper |
Bounds on Absorption Probabilities for the m-Dimensional Random Walk | 1977-01-01 | Paper |
Discounting, Ergodicity and Convergence for Markov Decision Processes | 1977-01-01 | Paper |
Optimal Funding Paths for a Class of Risky R&D Projects | 1975-01-01 | Paper |
Planning Horizons for the Dynamic Lot Size Model: Zabel vs. Protective Procedures and Computational Results | 1975-01-01 | Paper |
General Planning Horizons for Production Smoothing with Deterministic Demands | 1974-01-01 | Paper |
Decision Horizons in Discrete Time Undiscounted Markov Renewal Programming | 1974-01-01 | Paper |
Planning Horizons for Production Smoothing with Deterministic Demands | 1973-01-01 | Paper |
A mixed optimization technique for the generalized machine replacement problem | 1972-01-01 | Paper |
Technical Note—On the Asymptotic Convergence Rate of Cost Differences for Markovian Decision Processes | 1971-01-01 | Paper |
Technical Note—Undiscounted Markov Renewal Programming Via Modified Successive Approximations | 1971-01-01 | Paper |
The Near-Myopic Nature of the Lagged-Proportional-Cost Inventory Problem with Lost Sales | 1971-01-01 | Paper |
Letter to the Editor—A Critique of the Norman-White Dynamic Programming Approximation | 1969-01-01 | Paper |