Planning Horizons for Production Smoothing with Deterministic Demands
From MaRDI portal
Publication:4124585
DOI10.1287/mnsc.20.1.110zbMath0353.90042MaRDI QIDQ4124585
Thomas E. Morton, Howard C. Kunreuther
Publication date: 1973
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.20.1.110
90C90: Applications of mathematical programming
90B30: Production models
49L99: Hamilton-Jacobi theories
Related Items
A forward algorithm and planning horizon procedure for the production smoothing problem without inventory, Strong planning and forecast horizons for a model with simultaneous price and production decisions, Planning horizons for multi-item hierarchical production scheduling problems: A heuristic search procedure, An effective algorithm for the capacitated single item lot size problem