Planning horizons for multi-item hierarchical production scheduling problems: A heuristic search procedure
We develop a direct search procedure for finding planning horizons for a multi-item hierarchical production planning process which consists of an aggregate planning problem and a master production scheduling problem. Experimental results show that the search heuristic is quite efficient in finding planning horizons for both the aggregate planning problem and the master scheduling problem. The results also show that the master schedule planning horizons need not be longer than the aggregate planning horizons.
- Multiple level production planning in rolling horizon assembly environments
- Hierarchical production planning for consumer goods
- scientific article; zbMATH DE number 744102
- Integrated versus hierarchical approach to aggregate production planning and master production scheduling
- Aggregate planning in hybrid flowshops
- `` Direct Search Solution of Numerical and Statistical Problems
- An Algorithm for the Dynamic Lot-Size Problem with Time-Varying Production Capacity Constraints
- An Analytic Framework for Evaluating Rolling Schedules
- Dynamic version of the economic lot size model
- Extensions of the Planning Horizon Theorem in the Dynamic Lot Size Model
- General Planning Horizons for Production Smoothing with Deterministic Demands
- Horizon Effects in Aggregate Production Planning with Seasonal Demand
- Optimal Production Scheduling and Employment Smoothing with Deterministic Demands
- Planning Horizons for Production Smoothing with Deterministic Demands
- Planning Horizons for the Dynamic Lot Size Model with Backlogging
- Planning Horizons for the Dynamic Lot Size Model: Zabel vs. Protective Procedures and Computational Results
- Production Planning Over Time and the Nature of the Expectation and Planning Horizon
- Production Smoothing with Fluctuating Price
- Using Linear Programming to Derive Planning Horizons for a Production Smoothing Problem
This page was built for publication: Planning horizons for multi-item hierarchical production scheduling problems: A heuristic search procedure
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1107425)