Optimal Production Scheduling and Employment Smoothing with Deterministic Demands
From MaRDI portal
Cited in
(7)- Planning horizons for multi-item hierarchical production scheduling problems: A heuristic search procedure
- Note on utilizing stochastic optimal control in aggregate production planning
- Design of production-inventory control systems incorporating fast-sampling control policies with implementation lead time
- Production scheduling and inventory control for multi-stage manufacturing systems
- Singular pertubation methods in the synthesis of control policies for production-inventory systems
- Discounted production scheduling and employment smoothing
- A forward algorithm and planning horizon procedure for the production smoothing problem without inventory
This page was built for publication: Optimal Production Scheduling and Employment Smoothing with Deterministic Demands
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5564932)