Multiple level production planning in rolling horizon assembly environments
From MaRDI portal
Recommendations
- Rolling horizon production planning for probabilistic time-varying demands
- An analysis of multi-level lot-sizing problems with a bottleneck under a rolling schedule environment
- Planning horizons for multi-item hierarchical production scheduling problems: A heuristic search procedure
- scientific article; zbMATH DE number 1031399
- Rolling horizon scheduling in a rolling-mill
Cites work
- scientific article; zbMATH DE number 3737349 (Why is no real title available?)
- A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System—A Network Approach
- A Deterministic Multiproduct, Multi-Facility Production and Inventory Model
- A Lagrangean-Based Heuristic for Dynamic Multilevel Multiitem Constrained Lotsizing with Setup Times
- Computationally Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems
- Dynamic Lot Size Models for Multi-Stage Assembly Systems
- Dynamic version of the economic lot size model
- Efficient, Effective Lot Sizing for Multistage Production Systems
- Improved Heuristics for Multi-Stage Requirements Planning Systems
- Lot Sizing in Serial Assembly Systems with Multiple Constrained Resources
- Multilevel capacitated lotsizing complexity and LP-based heuristics
- The Lagrangian Relaxation Method for Solving Integer Programming Problems
Cited in
(10)- Simulation and performance evaluation of partially and fully integrated sales and operations planning
- Lead time anticipation in supply chain operations planning
- Planning horizons for multi-item hierarchical production scheduling problems: A heuristic search procedure
- An alternative to safety stock policies for multi-level rolling schedule MRP problems
- Rolling horizon production planning for probabilistic time-varying demands
- Incorporating a database approach into the large-scale multi-level lot sizing problem
- Master production schedule time interval strategies in make-to-order supply chains¶
- Rolling Horizon Procedures for the Facilities in Series Inventory Model with Nested Schedules
- Multilevel Scheduling of Multistage Production with Limited In-Process Inventory
- New lot sizing heuristics for demand and price uncertainties with service-level constraint
This page was built for publication: Multiple level production planning in rolling horizon assembly environments
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1809820)