Master production schedule time interval strategies in make-to-order supply chains¶
From MaRDI portal
Publication:3533180
Recommendations
- A practical view of the complexity in developing master production schedules: fundamentals, examples, and implementation
- MPS with multiple freeze fences in multi-product multi-level MRP systems
- Lot-sizing rules and freezing the master production schedule in material requirements planning systems under demand uncertainty
- Schedule instability, service level and cost in a material requirements planning system
- Revising the master production schedule in a HPP framework context
Cites work
- A new family of power transformations to improve normality or symmetry
- Dynamic version of the economic lot size model
- Improved Heuristics for Multi-Stage Requirements Planning Systems
- Improved rolling schedules for the dynamic single-level lot-sizing problem
- Lot sizing and scheduling -- survey and extensions
- Lot-sizing rules and freezing the master production schedule in material requirements planning systems under demand uncertainty
- Multiple level production planning in rolling horizon assembly environments
- Parameters affecting the effectiveness of MRP systems: A review
- Planning Horizons for the Dynamic Lot Size Model: Zabel vs. Protective Procedures and Computational Results
- Questioning the relative virtues of dynamic lot sizing rules
- Rolling horizon production planning for probabilistic time-varying demands
- Single item lot sizing problems
Cited in
(2)
This page was built for publication: Master production schedule time interval strategies in make-to-order supply chains¶
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3533180)