Pages that link to "Item:Q1042179"
From MaRDI portal
The following pages link to Minimizing the number of machines for scheduling jobs with equal processing times (Q1042179):
Displayed 3 items.
- The optimal number of used machines in a two-stage flexible flowshop scheduling problem (Q398915) (← links)
- Scheduling unrelated parallel machines with optional machines and jobs selection (Q1762164) (← links)
- Parallel machine problems with equal processing times: a survey (Q2434248) (← links)