The optimal number of used machines in a two-stage flexible flowshop scheduling problem (Q398915)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: The optimal number of used machines in a two-stage flexible flowshop scheduling problem |
scientific article; zbMATH DE number 6331201
| Language | Label | Description | Also known as |
|---|---|---|---|
| default for all languages | No label defined |
||
| English | The optimal number of used machines in a two-stage flexible flowshop scheduling problem |
scientific article; zbMATH DE number 6331201 |
Statements
The optimal number of used machines in a two-stage flexible flowshop scheduling problem (English)
0 references
18 August 2014
0 references
scheduling
0 references
sequencing
0 references
deterministic
0 references
flowshop
0 references
makespan
0 references
flowtime
0 references
0 references
0 references
0 references
0 references
0.914922833442688
0 references
0.8270421624183655
0 references
0.8211249709129333
0 references