Pages that link to "Item:Q1102856"
From MaRDI portal
The following pages link to Optimal scheduling of reservoir releases during flood: Deterministic optimization problem. II: Case study (Q1102856):
Displaying 4 items.
- Optimal scheduling of reservoir releases during flood: Deterministic optimization problem. I: Procedure (Q1102855) (← links)
- Runge-Kutta based procedure for the optimal control of differential-algebraic equations (Q1265028) (← links)
- Feasible direction algorithm for optimal control problems with state and control constraints: Implementation (Q1301894) (← links)
- A common regularization for three reservoir optimal control problems (Q1955563) (← links)