Pages that link to "Item:Q1278075"
From MaRDI portal
The following pages link to Project network models with discounted cash flows a guided tour through recent developments (Q1278075):
Displayed 25 items.
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- The discrete time/cost trade-off problem: Extensions and heuristic procedures (Q835571) (← links)
- An optimization model for stochastic project networks with cash flows (Q867428) (← links)
- Scheduling jobs on a single machine to maximize the total revenue of jobs (Q954056) (← links)
- Single-pass and approximate dynamic-programming algorithms for order acceptance and capacity planning (Q964848) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- Pricing and two-tier advertising with one manufacturer and one retailer (Q1011237) (← links)
- Maximizing the net present value of a project under uncertainty (Q1039778) (← links)
- Simulated annealing and tabu search for multi-mode project payment scheduling (Q1042041) (← links)
- Scheduling projects with stochastic activity duration to maximize expected net present value (Q1042042) (← links)
- An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations (Q1265850) (← links)
- Ensuring quality in resource constrained project scheduling (Q1280181) (← links)
- A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations (Q1303751) (← links)
- Order-based neighborhoods for project scheduling with nonregular objective functions. (Q1399577) (← links)
- Resource-constrained project scheduling: A survey of recent developments. (Q1406618) (← links)
- Improving project cost estimation by taking into account managerial flexibility (Q1590029) (← links)
- An equitable approach to the payment scheduling problem in project management (Q1590032) (← links)
- Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints (Q1590046) (← links)
- Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models (Q1767683) (← links)
- Resource-constrained project scheduling: Notation, classification, models, and methods (Q1806880) (← links)
- Integration of equipment planning and project scheduling (Q2384850) (← links)
- Discrete-continuous project scheduling with discounted cash flows - a tabu search approach (Q2468474) (← links)
- Multi-mode project payment scheduling problems with bonus-penalty structure (Q2482794) (← links)
- Client‐contractor bargaining on net present value in project scheduling with limited resources (Q3621917) (← links)
- Setting gates for activities in the stochastic project scheduling problem through the cross entropy methodology (Q5919228) (← links)