The following pages link to Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints (Q1590046):
Displaying 28 items.
- A genetic algorithm for the robust resource leveling problem (Q283265) (← links)
- Energy-oriented scheduling based on evolutionary algorithms (Q337370) (← links)
- The total adjustment cost problem: applications, models, and solution algorithms (Q398909) (← links)
- Resource leveling in a machine environment (Q418090) (← links)
- R\&D pipeline management: task interdependencies and risk management (Q420877) (← links)
- Scheduling tests in automotive R\&D projects (Q954930) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- Maximizing the net present value of a project under uncertainty (Q1039778) (← links)
- Simulated annealing and tabu search for multi-mode project payment scheduling (Q1042041) (← links)
- Order-based neighborhoods for project scheduling with nonregular objective functions. (Q1399577) (← links)
- A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints (Q1628053) (← links)
- Which fuzzy ranking method is best for maximizing fuzzy net present value? (Q1640504) (← links)
- A branch and bound algorithm for project scheduling problem with spatial resource constraints (Q1666182) (← links)
- A cost optimization model for multiresource leveling problem without project duration constraint (Q1727483) (← links)
- Optimizing version release dates of research and development long-term processes (Q1751861) (← links)
- Mixed-integer linear programming and constraint programming formulations for solving resource availability cost problems (Q1754108) (← links)
- Maximizing the expected net present value of a project with phase-type distributed activity durations: an efficient globally optimal solution procedure (Q1754200) (← links)
- Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models (Q1767683) (← links)
- Mixed-integer linear programming for resource leveling problems (Q1926816) (← links)
- A common approximation framework for early work, late work, and resource leveling problems (Q2184097) (← links)
- Scheduling personnel for the build-up of unit load devices at an air cargo terminal with limited space (Q2197157) (← links)
- Considering project management activities for engineering design groups (Q2226486) (← links)
- The bilevel optimisation of a multi-agent project scheduling and staffing problem (Q2239938) (← links)
- A metaheuristic solution approach for the time-constrained project scheduling problem (Q2362168) (← links)
- Exact methods for the resource levelling problem (Q2434257) (← links)
- A master surgical scheduling approach for cyclic scheduling in operating room departments (Q2481565) (← links)
- Project selection, scheduling and resource allocation with time dependent returns (Q2519075) (← links)
- Resource leveling in projects with flexible structures (Q6099408) (← links)