Pages that link to "Item:Q1767683"
From MaRDI portal
The following pages link to Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models (Q1767683):
Displayed 9 items.
- Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting (Q859913) (← links)
- Optimization and analysis of the profitability of tariff structures with two-part tariffs (Q976514) (← links)
- Theoretical aspects of multicriteria flight gate scheduling: Deterministic and fuzzy models (Q983626) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- Simulated annealing and tabu search for multi-mode project payment scheduling (Q1042041) (← links)
- Discrete-continuous project scheduling with discounted cash flows - a tabu search approach (Q2468474) (← links)
- Multi-mode project payment scheduling problems with bonus-penalty structure (Q2482794) (← links)
- A scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flows (Q3163363) (← links)
- Client‐contractor bargaining on net present value in project scheduling with limited resources (Q3621917) (← links)