Pages that link to "Item:Q1779707"
From MaRDI portal
The following pages link to A polynomial algorithm for no-wait cyclic hoist scheduling in an extended electroplating line (Q1779707):
Displayed 6 items.
- Cycle time analysis of dual-arm cluster tools for wafer fabrication processes with multiple wafer revisiting times (Q337294) (← links)
- Optimal scheduling of material handling devices in a PCB production line: problem formulation and a polynomial algorithm (Q955949) (← links)
- Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots (Q1042101) (← links)
- Cyclic flowshop scheduling with operators and robots: Vyacheslav Tanaev's vision and lasting contributions (Q2434294) (← links)
- Minimizing the cycle time of multiple-product processing networks with a fixed operation sequence, setups, and time-window constraints (Q2467264) (← links)
- Cyclic hoist scheduling in large real-life electroplating lines (Q2642305) (← links)