Pages that link to "Item:Q2270442"
From MaRDI portal
The following pages link to Bi-objective ant colony optimization approach to optimize production and maintenance scheduling (Q2270442):
Displaying 16 items.
- Optimized task scheduling and resource allocation on cloud computing environment using improved differential evolution algorithm (Q336698) (← links)
- A new approach for maintenance scheduling of generating units in electrical power systems based on their operational hours (Q337075) (← links)
- Scheduling optimization of a stochastic flexible job-shop system with time-varying machine failure rate (Q337585) (← links)
- Scheduling of bus maintenance by the P-graph methodology (Q402246) (← links)
- A multi-objective approach to simultaneous determination of spare part numbers and preventive replacement times (Q534879) (← links)
- Multiobjective joint optimization of production scheduling and maintenance planning in the flexible job-shop problem (Q1666440) (← links)
- Joint production and preventive maintenance scheduling for a single degraded machine by considering machine failures (Q1688445) (← links)
- Hybrid optimization algorithm of particle swarm optimization and cuckoo search for preventive maintenance period optimization (Q1723651) (← links)
- Solving multi-objective parallel machine scheduling problem by a modified NSGA-II (Q1788959) (← links)
- Integrating preventive maintenance planning and production scheduling under reentrant job shop (Q1993028) (← links)
- A joint optimization model of production scheduling and maintenance based on data driven for a parallel-series production line (Q2052118) (← links)
- Production, maintenance and resource scheduling: a review (Q2098022) (← links)
- Tactical level strategies for multi-objective disassembly line balancing problem with multi-manned stations: an optimization model and solution approaches (Q2108816) (← links)
- Coordinated optimization of production scheduling and maintenance activities with machine reliability deterioration (Q2171074) (← links)
- Data-driven predictive maintenance policy based on multi-objective optimization approaches for the component repairing problem (Q6048047) (← links)
- Absolute bounds of list algorithms for parallel machines scheduling with unavailability periods (Q6090983) (← links)