Multiobjective joint optimization of production scheduling and maintenance planning in the flexible job-shop problem (Q1666440)

From MaRDI portal
scientific article
Language Label Description Also known as
English
Multiobjective joint optimization of production scheduling and maintenance planning in the flexible job-shop problem
scientific article

    Statements

    Multiobjective joint optimization of production scheduling and maintenance planning in the flexible job-shop problem (English)
    0 references
    0 references
    0 references
    0 references
    27 August 2018
    0 references
    Summary: In order to solve the joint optimization of production scheduling and maintenance planning problem in the flexible job-shop, a multiobjective joint optimization model considering the maximum completion time and maintenance costs per unit time is established based on the concept of flexible job-shop and preventive maintenance. A weighted sum method is adopted to eliminate the index dimension. In addition, a double-coded genetic algorithm is designed according to the problem characteristics. The best result under the circumstances of joint decision-making is obtained through multiple simulation experiments, which proves the validity of the algorithm. We can prove the superiority of joint optimization model by comparing the result of joint decision-making project with the result of independent decision-making project under fixed preventive maintenance period. This study will enrich and expand the theoretical framework and analytical methods of this problem; it provides a scientific decision analysis method for enterprise to make production plan and maintenance plan.
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references