Multiobjective joint optimization of production scheduling and maintenance planning in the flexible job-shop problem
From MaRDI portal
Publication:1666440
DOI10.1155/2015/725460zbMath1394.90314OpenAlexW2159079093WikidataQ59119053 ScholiaQ59119053MaRDI QIDQ1666440
Publication date: 27 August 2018
Published in: Mathematical Problems in Engineering (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2015/725460
Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35) Reliability, availability, maintenance, inspection in operations research (90B25)
Cites Work
This page was built for publication: Multiobjective joint optimization of production scheduling and maintenance planning in the flexible job-shop problem