Integrating preventive maintenance planning and production scheduling under reentrant job shop
Summary: This paper focuses on a preventive maintenance plan and production scheduling problem under reentrant Job Shop in semiconductor production. Previous researches discussed production scheduling and preventive maintenance plan independently, especially on reentrant Job Shop. Due to reentrancy, reentrant Job Shop scheduling is more complex than the standard Job Shop which belongs to NP-hard problems. Reentrancy is a typical characteristic of semiconductor production. What is more, the equipment of semiconductor production is very expensive. Equipment failure will affect the normal production plan. It is necessary to maintain it regularly. So, we establish an integrated and optimal mathematical model. In this paper, we use the hybrid particle swarm optimization algorithm to solve the problem for it is highly nonlinear and discrete. The proposed model is evaluated through some simple simulation experiments and the results show that the model works better than the independent decision-making model in terms of minimizing maximum completion time.
- Two-machine flow shop scheduling integrated with preventive maintenance planning
- Joint job scheduling and preventive maintenance on a single machine
- Multiobjective joint optimization of production scheduling and maintenance planning in the flexible job-shop problem
- Joint optimization of preventive maintenance and production scheduling for parallel machines system
- Joint production and preventive maintenance scheduling for a single degraded machine by considering machine failures
- Bi-objective ant colony optimization approach to optimize production and maintenance scheduling
- Genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops
- Modeling the reentrant job shop scheduling problem with setups for metaheuristic searches
- Planning Machine Maintenance in Two-Machine Shop Scheduling
- Re-entrant lines
This page was built for publication: Integrating preventive maintenance planning and production scheduling under reentrant job shop