Multi-objective optimization of integrated lot-sizing and scheduling problem in flexible job shops
From MaRDI portal
Publication:2826667
DOI10.1051/RO/2015049zbMath1351.90100OpenAlexW2482722439MaRDI QIDQ2826667
Rashed. Sahraeian, Behdin Vahedi-Nouri, Mohammad. Rohaninejad
Publication date: 18 October 2016
Published in: RAIRO - Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1051/ro/2015049
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Production models (90B30)
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Combining the principles of variable neighborhood decomposition search and the Fix\&Optimize heuristic to solve multi-level lot-sizing and scheduling problems
- Multi-level single machine lot-sizing and scheduling with zero lead times
- Multilevel capacitated lotsizing complexity and LP-based heuristics
- Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case
- Two hybrid meta-heuristics for the finite horizon ELSP in flexible flow lines with unrelated parallel machines
- Fuzzy job shop scheduling with lot-sizing
- Solving uncapacitated multilevel lot-sizing problems using a particle swarm optimization with flexible inertial weight
- Equivalence classes of problem instances for a continuous-time lot sizing and scheduling problem
- Hybrid simulated annealing and MIP-based heuristics for stochastic lot-sizing and scheduling problem in capacitated multi-stage production system
- Rolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costs
- MIP-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs
- The Deterministic Dynamic Product Cycling Problem
- Lagrangean Heuristic for a Multi-Plant Lot-Sizing Problem with Transfer and Storage Capacities
This page was built for publication: Multi-objective optimization of integrated lot-sizing and scheduling problem in flexible job shops