Pages that link to "Item:Q2356207"
From MaRDI portal
The following pages link to The two-machine flowshop scheduling problem with sequence-independent setup times: new lower bounding strategies (Q2356207):
Displaying 6 items.
- The third comprehensive survey on scheduling problems with setup times/costs (Q319774) (← links)
- Green scheduling of a two-machine flowshop: trade-off between makespan and energy consumption (Q320777) (← links)
- The two-machine flowshop total completion time problem: branch-and-bound algorithms based on network-flow formulation (Q322969) (← links)
- A mixed integer programming approach for the single machine problem with unequal release dates (Q337161) (← links)
- Enhanced migrating birds optimization algorithm for the permutation flow shop problem with sequence dependent setup times (Q1694317) (← links)
- Solving permutation flow shop scheduling problem with sequence-independent setup time (Q2176034) (← links)