Solving permutation flow shop scheduling problem with sequence-independent setup time (Q2176034)

From MaRDI portal

!

This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use the normal view instead:

scientific article; zbMATH DE number 7195536
Language Label Description Also known as
default for all languages
No label defined
    English
    Solving permutation flow shop scheduling problem with sequence-independent setup time
    scientific article; zbMATH DE number 7195536

      Statements

      Solving permutation flow shop scheduling problem with sequence-independent setup time (English)
      0 references
      0 references
      0 references
      0 references
      30 April 2020
      0 references
      Summary: In this paper, we study the resolution of a permutation flow shop problem with sequence-independent setup time. The objective is to minimize the maximum of job completion time, also called the makespan. In this contribution, we propose three methods of resolution, a mixed-integer linear programming (MILP) model; two heuristics, the first based on Johnson's rule and the second based on the NEH algorithm; and finally two metaheuristics, the iterative local search algorithm and the iterated greedy algorithm. A set of test problems is simulated numerically to validate the effectiveness of our resolution approaches. For relatively small-size problems, it has been revealed that the adapted NEH heuristic has the best performance than that of the Johnson-based heuristic. For the relatively medium and large problems, the comparative study between the two metaheuristics based on the exploration of the neighborhood shows that the iterated greedy algorithm records the best performances.
      0 references
      0 references

      Identifiers