Pages that link to "Item:Q2379653"
From MaRDI portal
The following pages link to Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective (Q2379653):
Displaying 49 items.
- Machine scheduling in underground mining: an application in the potash industry (Q280169) (← links)
- A scatter search algorithm for the distributed permutation flowshop scheduling problem (Q297245) (← links)
- A novel Lagrangian relaxation approach for a hybrid flowshop scheduling problem in the steelmaking-continuous casting process (Q299834) (← links)
- Practical solutions for a dock assignment problem with trailer transportation (Q319870) (← links)
- Taking advantage of a diverse set of efficient production schedules: a two-step approach for scheduling with side concerns (Q336423) (← links)
- A two-stage hybrid flow shop with dedicated machines at the first stage (Q336642) (← links)
- Minimizing total completion time in a two-stage hybrid flow shop with dedicated machines at the first stage (Q337499) (← links)
- A heuristic method for two-stage hybrid flow shop with dedicated machines (Q339604) (← links)
- Flexible open shop scheduling problem to minimize makespan (Q342284) (← links)
- A new three-machine shop scheduling: complexity and approximation algorithm (Q386427) (← links)
- Permutation flow shop scheduling with order acceptance and weighted tardiness (Q419558) (← links)
- Approximation algorithms for the parallel flow shop problem (Q421785) (← links)
- An improved migrating birds optimisation for a hybrid flowshop scheduling with total flowtime minimisation (Q506145) (← links)
- Bounding strategies for the hybrid flow shop scheduling problem (Q545969) (← links)
- Optimal solutions for a dock assignment problem with trailer transportation (Q744629) (← links)
- Shifting representation search for hybrid flexible flowline problems (Q992723) (← links)
- Total tardiness minimization in permutation flowshop with deterioration consideration (Q1630777) (← links)
- A comprehensive review of flowshop group scheduling literature (Q1651625) (← links)
- Survey and extensions of manufacturing models in two-stage flexible flow shops with dedicated machines (Q1651647) (← links)
- Iterated search methods for earliness and tardiness minimization in hybrid flowshops with due windows (Q1652188) (← links)
- A sustainable aggregate production planning model for the chemical process industry (Q1652621) (← links)
- Effective metaheuristics for scheduling a hybrid flowshop with sequence-dependent setup times (Q1735381) (← links)
- Heuristics for periodical batch job scheduling in a MapReduce computing framework (Q1750408) (← links)
- A discrete time exact solution approach for a complex hybrid flow-shop scheduling problem with limited-wait constraints (Q1762015) (← links)
- Two-stage hybrid flow shop with precedence constraints and parallel machines at second stage (Q1762032) (← links)
- A genetic algorithm for the hybrid flow shop scheduling with unrelated machines and machine eligibility (Q1782178) (← links)
- A Pareto-based adaptive variable neighborhood search for biobjective hybrid flow shop scheduling problem with sequence-dependent setup time (Q1792653) (← links)
- Two-stage proportionate flexible flow shop to minimize the makespan (Q1945694) (← links)
- New heuristics for total tardiness minimization in a flexible flowshop (Q1947616) (← links)
- A branch and bound algorithm for hybrid flow shop scheduling problem with setup time and assembly operations (Q1991311) (← links)
- A simulation-optimization model for solving flexible flow shop scheduling problems with rework and transportation (Q1998264) (← links)
- Efficiency of the solution representations for the hybrid flow shop scheduling problem with makespan objective (Q2003565) (← links)
- Minimizing makespan in a two-stage hybrid flow shop scheduling problem with open shop in one stage (Q2248262) (← links)
- Metaheuristic algorithms for the hybrid flowshop scheduling problem (Q2273670) (← links)
- Hybrid flow shop with unrelated machines, setup time, and work in progress buffers for bi-objective optimization of tortilla manufacturing (Q2283857) (← links)
- An improved particle swarm optimization algorithm to solve hybrid flowshop scheduling problems with the effect of human factors -- a case study (Q2337384) (← links)
- A heuristic for scheduling in a two-stage hybrid flowshop with renewable resources shared among the stages (Q2356251) (← links)
- Flexible job shop scheduling with blockages (Q2454071) (← links)
- An approximation algorithm for proportionate scheduling in the two-stage hybrid flow shop (Q2512819) (← links)
- Iterated greedy algorithms enhanced by hyper-heuristic based learning for hybrid flexible flowshop scheduling problem with sequence dependent setup times: a case study at a manufacturing plant (Q2664430) (← links)
- Energy aware scheduling in flexible flow shops with hybrid particle swarm optimization (Q2664442) (← links)
- A parameter-less iterated greedy method for the hybrid flowshop scheduling problem with setup times and due date windows (Q2673560) (← links)
- Method of rescheduling for hybrid production lines with intermediate buffers (Q5150030) (← links)
- Multi-objective energy-efficient hybrid flow shop scheduling using Q-learning and GVNS driven NSGA-II (Q6047920) (← links)
- A review and classification on distributed permutation flowshop scheduling problems (Q6069211) (← links)
- Meta-Lamarckian-based iterated greedy for optimizing distributed two-stage assembly flowshops with mixed setups (Q6099438) (← links)
- A systematic review of multi-objective hybrid flow shop scheduling (Q6112731) (← links)
- Exact and metaheuristic approaches to solve the integrated production scheduling, berth allocation and storage yard allocation problem (Q6164375) (← links)
- Effective upper and lower bounds for a two-stage reentrant flexible flow shop scheduling problem (Q6164382) (← links)