Pages that link to "Item:Q2467429"
From MaRDI portal
The following pages link to A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems (Q2467429):
Displaying 39 items.
- Numerical solution of certain exponential and non-linear Diophantine systems of equations by using a discrete particle swarm optimization algorithm (Q275842) (← links)
- A mixed-discrete particle swarm optimization algorithm with explicit diversity-preservation (Q381954) (← links)
- Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem (Q415556) (← links)
- Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers (Q421579) (← links)
- An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problem (Q433107) (← links)
- Multimode preemptive resource investment problem subject to due dates for activities: formulation and solution procedure (Q471724) (← links)
- A dynamic intelligent decision approach to dependency modeling of project tasks in complex engineering system optimization (Q473573) (← links)
- Multi-mode resource-constrained project scheduling problem with material ordering under bonus-penalty policies (Q526633) (← links)
- Project scheduling heuristics-based standard PSO for task-resource assignment in heterogeneous grid (Q535971) (← links)
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- Reactive scheduling in the multi-mode RCPSP (Q709110) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- Differential evolution for solving multi-mode resource-constrained project scheduling problems (Q1010277) (← links)
- A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem (Q1037664) (← links)
- Multi-mode resource availability cost problem with recruitment and release dates for resources (Q1634132) (← links)
- A path-relinking algorithm for the multi-mode resource-constrained project scheduling problem (Q1651597) (← links)
- An applicable method for modifying over-allocated multi-mode resource constraint schedules in the presence of preemptive resources (Q1698276) (← links)
- An efficient particle swarm optimizer with application to man-day project scheduling problems (Q1718586) (← links)
- Bio-inspired meta-heuristics for emergency transportation problems (Q1736600) (← links)
- A practical and robust execution time-frame procedure for the multi-mode resource-constrained project scheduling problem with minimal and maximal time lags (Q1736833) (← links)
- Resource tardiness weighted cost minimization in project scheduling (Q1748510) (← links)
- Optimizing version release dates of research and development long-term processes (Q1751861) (← links)
- An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem (Q1762055) (← links)
- A modified PSO algorithm for minimizing the total costs of resources in MRCPSP (Q1954712) (← links)
- Mode-based versus activity-based search for a nonredundant resolution of the multimode resource-constrained project scheduling problem (Q1992769) (← links)
- Multimode time-cost-robustness trade-off project scheduling problem under uncertainty (Q2156293) (← links)
- The effect of velocity sparsity on the performance of cardinality constrained particle swarm optimization (Q2174914) (← links)
- Considering project management activities for engineering design groups (Q2226486) (← links)
- An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances (Q2256244) (← links)
- A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem (Q2270291) (← links)
- Model and algorithm for human resource-constrained R\&D program scheduling optimization (Q2296461) (← links)
- Gravitational particle swarm (Q2453309) (← links)
- Integrated multi-project planning and scheduling -- a multiagent approach (Q2672092) (← links)
- A modified modeling approach and a heuristic procedure for the multi-mode resource constrained project scheduling problem with activity splitting (Q2798120) (← links)
- An innovative four-layer heuristic for scheduling multi-mode projects under multiple resource constrains (Q5244304) (← links)
- A multiobjective hybrid ant colony optimization approach applied to the assignment and scheduling problem (Q5246811) (← links)
- Hybrid particle swarm and differential evolution algorithm for solving multimode resource-constrained project scheduling problem (Q5964346) (← links)
- Multi‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristic (Q6088236) (← links)
- A data-driven \textit{meta}-learning recommendation model for multi-mode resource constrained project scheduling problem (Q6106590) (← links)